User contributions for JamesCowan
Jump to navigation
Jump to search
- 04:46, 19 July 2022 diff hist +292 Geotextiles: Installation
- 04:43, 19 July 2022 diff hist +2 Geotextiles: Installation
- 04:43, 19 July 2022 diff hist +19 Geotextiles: Installation
- 04:39, 19 July 2022 diff hist +254 Geotextiles: Installation
- 04:28, 19 July 2022 diff hist +8 Geotextiles: Installation
- 04:21, 19 July 2022 diff hist 0 Geotextiles: Installation
- 04:20, 19 July 2022 diff hist 0 Geotextiles: Installation
- 04:20, 19 July 2022 diff hist +4 Geotextiles: Installation
- 04:19, 19 July 2022 diff hist +4 Geotextiles: Installation
- 04:19, 19 July 2022 diff hist 0 Geotextiles: Installation
- 04:17, 19 July 2022 diff hist +268 Geotextiles: Installation
- 04:10, 19 July 2022 diff hist 0 N File:Geotextile-RS380I.jpg current
- 04:05, 19 July 2022 diff hist 0 N File:Geogrid-silvacells.jpg current
- 04:00, 19 July 2022 diff hist 0 N File:Geogrid-beside.jpg current
- 03:52, 19 July 2022 diff hist 0 N File:Geotextile-backfill-underdrain.jpg current
- 03:44, 19 July 2022 diff hist 0 N File:Geotextile-facility-side.jpg current
- 18:27, 18 July 2022 diff hist −22 Geotextiles: Installation
- 18:27, 18 July 2022 diff hist +36 Geotextiles: Installation
- 18:20, 18 July 2022 diff hist +2,359 N Geotextiles: Installation Created page with "Geotextiles Geotextiles are filter fabrics that can be installed to separate dissimilar soils and prevent the migration of materials. Geotextiles are recommended for installation at the bottom and side limits of the LID feature and should be implemented at the discretion of the engineer. Construction Steps: #Roll out fabric on the flattened sub-grade surface #Provide a minimum overlap of 300 mm between adjacent lengths of geotextile. If the manufacturer specifies a grea..."
- 16:01, 9 June 2022 diff hist +18 Bioretention: Construction →Backfill Granular and Pipes (SPC)
- 16:00, 9 June 2022 diff hist +89 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 15:57, 9 June 2022 diff hist 0 N File:Impermeable-liner-along-road.jpg current
- 15:57, 9 June 2022 diff hist +166 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:43, 9 June 2022 diff hist 0 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:42, 9 June 2022 diff hist −1 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:42, 9 June 2022 diff hist +1 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:41, 9 June 2022 diff hist +123 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:38, 9 June 2022 diff hist 0 N File:Geotextile-with-excess-and-granular.jpg current
- 14:34, 9 June 2022 diff hist −136 File:Geotextile-with-excess-and-gravel.JPG →Summary current Tag: Blanking
- 14:33, 9 June 2022 diff hist 0 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:32, 9 June 2022 diff hist +50 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 14:29, 9 June 2022 diff hist +136 N File:Geotextile-with-excess-and-gravel.JPG Geotextile with excess material draped over the edge of the LID facility. Backfill with granular material is taking place.
- 15:13, 31 May 2022 diff hist +1 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 15:11, 31 May 2022 diff hist −228 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 15:09, 31 May 2022 diff hist +3 Bioretention: Construction →Finishing Grades: Inlet, Outlet, Biomedia, Plants (JC)
- 15:07, 31 May 2022 diff hist 0 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 15:01, 31 May 2022 diff hist +28 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 13:54, 31 May 2022 diff hist +379 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 13:54, 31 May 2022 diff hist −2 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 13:52, 31 May 2022 diff hist +4 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 13:52, 31 May 2022 diff hist +16 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 13:51, 31 May 2022 diff hist +3,348 Bioretention: Construction →Address Deficiencies and Assumption Protocols (JC)
- 13:47, 31 May 2022 diff hist +1,025 Bioretention: Construction →Finishing Grades: Inlet, Outlet, Biomedia, Plants (JC)
- 19:47, 30 May 2022 diff hist +1,848 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 19:43, 30 May 2022 diff hist +3,043 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 19:39, 30 May 2022 diff hist +5 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 19:39, 30 May 2022 diff hist +1 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 19:38, 30 May 2022 diff hist −16 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 19:37, 30 May 2022 diff hist +11 Bioretention: Construction →Backfill Granular and Pipes (JC)
- 19:36, 30 May 2022 diff hist +1,693 Bioretention: Construction →Backfill Granular and Pipes (JC)