User contributions for JamesCowan
Jump to navigation
Jump to search
- 14:23, 21 July 2022 diff hist −28 Monitoring wells: Installation
- 14:22, 21 July 2022 diff hist −20 Impermeable liners: Installation
- 14:21, 21 July 2022 diff hist −32 Underdrains: Installation
- 14:20, 21 July 2022 diff hist −4 Geogrids: Installation
- 14:20, 21 July 2022 diff hist −28 Geotextiles: Installation
- 02:15, 21 July 2022 diff hist +252 N Addressing deficiencies Created page with "====Addressing deficiencies==== Prior to passing responsibility to the landowner, contractors must ensure that any deficiencies in the LID feature’s construction are addressed. Keep in-mind what mistakes must be avoided during each construction task."
- 01:53, 21 July 2022 diff hist −1 Permanent fencing
- 01:53, 21 July 2022 diff hist 0 Permanent fencing
- 01:53, 21 July 2022 diff hist +23 Permanent fencing
- 01:51, 21 July 2022 diff hist +25 As-built surveys
- 01:50, 21 July 2022 diff hist +17 As-built surveys
- 01:44, 21 July 2022 diff hist +18 Overflow: Installation
- 01:44, 21 July 2022 diff hist +9 Overflow: Installation
- 01:40, 21 July 2022 diff hist +37 Monitoring wells: Installation
- 01:37, 21 July 2022 diff hist +47 Monitoring wells: Installation
- 01:25, 21 July 2022 diff hist +45 Impermeable liners: Installation
- 01:23, 21 July 2022 diff hist +52 Underdrains: Installation
- 01:17, 21 July 2022 diff hist +17 Geogrids: Installation
- 01:15, 21 July 2022 diff hist +52 Geotextiles: Installation
- 18:50, 20 July 2022 diff hist +8 Impermeable liners: Installation
- 18:43, 20 July 2022 diff hist −73 Impermeable liners: Installation
- 18:42, 20 July 2022 diff hist +12 Impermeable liners: Installation
- 18:34, 20 July 2022 diff hist +46 Underdrains: Installation
- 18:30, 20 July 2022 diff hist +4 Underdrains: Installation
- 18:25, 20 July 2022 diff hist +78 Geogrids: Installation
- 18:25, 20 July 2022 diff hist −103 Geotextiles: Installation
- 18:19, 20 July 2022 diff hist +11 Geotextiles: Installation
- 18:15, 20 July 2022 diff hist +39 N Installation of underdrains JamesCowan moved page Installation of underdrains to Underdrains: Installation current Tag: New redirect
- 18:15, 20 July 2022 diff hist 0 m Underdrains: Installation JamesCowan moved page Installation of underdrains to Underdrains: Installation
- 18:15, 20 July 2022 diff hist +46 N Installation of impermeable liners JamesCowan moved page Installation of impermeable liners to Impermeable liners: Installation current Tag: New redirect
- 18:15, 20 July 2022 diff hist 0 m Impermeable liners: Installation JamesCowan moved page Installation of impermeable liners to Impermeable liners: Installation
- 18:14, 20 July 2022 diff hist +36 N Installation of geogrids JamesCowan moved page Installation of geogrids to Geogrids: Installation current Tag: New redirect
- 18:14, 20 July 2022 diff hist 0 m Geogrids: Installation JamesCowan moved page Installation of geogrids to Geogrids: Installation
- 18:11, 20 July 2022 diff hist +39 N Installation of geotextiles JamesCowan moved page Installation of geotextiles to Geotextiles: Installation current Tag: New redirect
- 18:11, 20 July 2022 diff hist 0 m Geotextiles: Installation JamesCowan moved page Installation of geotextiles to Geotextiles: Installation
- 15:17, 20 July 2022 diff hist 0 Final Certification
- 15:16, 20 July 2022 diff hist +70 Final Certification
- 15:00, 20 July 2022 diff hist +205 Final Certification
- 14:56, 20 July 2022 diff hist 0 N File:Flood-test-permeable-pavers.jpg current
- 14:54, 20 July 2022 diff hist 0 N File:Flood-test-bioretention.jpg current
- 14:07, 20 July 2022 diff hist +32 Final Certification
- 14:06, 20 July 2022 diff hist +2,972 N Final Certification Created page with "Final inspection requirements are in-place to ensure that a final site-wide inspection is performed and allow for mitigation to occur before the contractor is relieved of responsibility. Final certifications are performed by knowledgeable personnel, such as the design engineer, who are qualified to ensure that LID features are operating as intended. This stage is critically important, as it is the last opportunity for issues to be resolved before the property owner assum..."
- 13:34, 20 July 2022 diff hist +6 Permanent fencing Tag: Manual revert
- 13:33, 20 July 2022 diff hist −5 Permanent fencing
- 13:33, 20 July 2022 diff hist −1 Permanent fencing
- 13:31, 20 July 2022 diff hist +97 Permanent fencing
- 13:29, 20 July 2022 diff hist 0 N File:Permanent-fencing.jpg current
- 13:25, 20 July 2022 diff hist +343 N Permanent fencing Created page with "Permanent Fencing Delineating features with permanent fencing can eliminate tripping and falling hazards and protect soil media and plantings. Construction Steps: #Securely install fencing around the perimeter of the feature Inspection Points: *Fencing size and material matches design *Fencing is installed in correct location as per design"
- 20:08, 19 July 2022 diff hist +5 As-built surveys
- 20:07, 19 July 2022 diff hist +5 As-built surveys