Inspection & Maintenance Guidance of underground infiltration systems' best management practices that refers to LIDs that capture and temporarily store rainwater and snowmelt from hard surfaces (e.g., roofs and pavements) below ground in geotextile filter fabric lined excavations filled with washed gravel or other void space forming structures (TRCA, 2018)[1]

Overview[edit]

Underground infiltration systems is a general term that refers to best management practices (BMPs) that capture and temporarily store stormwater from hard surfaces. These systems treat stormwater by detaining it to allow suspended sediments to settle out and soaking it into the ground where it is filtered and cleansed by interaction with soil. Runoff water is delivered to the practice through pipes connected to catchbasins, hydrodynamic (i.e., oil and grit) separators, filters, manholes, sub-drains of other features or roof downspouts. They are installed below the local maximum frost penetration depth to ensure they continue to drain year-round. Water that is in excess of the storage capacity overflows to an adjacent drainage system (e.g., municipal storm sewer or other BMP), typically via pipe or manhole containing a control structure (e.g., weir wall), to safely convey flows during flood events. Depending on the permeability of the underlying soil, such practices may be designed without a sub-drain for full infiltration or with a sub-drain for partial infiltration. The sub-drain pipe may feature a flow restrictor (e.g., orifice cap, valve) for gradually releasing detained water and optimizing the amount drained by infiltration.

General plan and profile (cross-section) views showcasing key components and sections of a typical infiltration trench.

Key components of Underground Infiltration Systems to pay close attention to are the:

Trash, debris and sediment builds up at these locations and can prevent water from flowing into or out of the practice.

Associated Practices[edit]

  • Soakaways: Typically service individual lots and receive only roof and walkway runoff but can also be designed to receive overflows from other BMPs (e.g., rain barrels or cisterns, rain gardens, green roofs. Also known as infiltration galleries, French drains, dry wells or soakaway pits.
  • Infiltration trenches: Linear oriented soakaways designed to fit into narrow strips of land between structures or properties, or along road rights-of-way; can also receive road runoff with adequate pretreatment devices upstream of inlets.
  • Infiltration chambers: Include a range of proprietary modular structures installed underground that create large void spaces for temporary storage of stormwater while providing sufficient load bearing capacity to allow construction of structures on top of them. Applications are similar to infiltration trenches. Also known as infiltration tanks or vaults.
  • Perforated pipe storm sewer systems or Exfiltration trenches: Linear-oriented infiltration trenches installed parallel with conventional storm sewer pipes and catchbasins that receive stormwater from them. May include manholes with perforated risers. Also known as exfiltration storm sewer, percolation drainage, or clean water collector systems.

Inspection and Testing Framework[edit]

An inlet to an infiltration trench during the fall in need of maintenance (TRCA, 2018).[1]
Visual Indicators Framework - Underground Infiltration Systems

Component

Indicators

Construction Inspection

Assumption Inspection

Routine Operation Inspection

Verification Inspection
Contributing Drainage Area
CDA condition x x x x
Inlet
Inlet/Flow Spreader Structural Integrity x x x
Inlet/Flow Spreader Structural Integrity x x x x
Perimeter
BMP dimensions x x x
Filter Bed
Filter bed sediment accumulation x x x
Underdrain & Monitoring Well
Monitoring well condition x x x x
Sub-drain/Perforated pipe obstruction x x
Outlets
Overflow outlet obstruction x x x x
Control Structure
Control structure condition x x x x
Control structure sediment accumulation x x x x



An example of a soakaway under construction with a newly installed monitoring well. To ensure performance assessment and infiltration testing can be conducted efficiently over the life cycle of this LID feature, the well condition must stay in good condition and be repaired immediately upon notice of significant damage (TRCA, 2018)[1].
Testing Indicators Framework - Underground Infiltration Systems

Component

Indicators

Construction Inspection

Assumption Inspection

Routine Operation Inspection

Verification Inspection
Testing Indicators
Sediment accumulation testing x x x x
Natural or simulated storm event testing x (x)
Continuous monitoring x (x)
Note: (x) denotes indicators to be used for Performance Verification inspections only (i.e., not for Maintenance Verification inspections)

Construction Inspection Tasks[edit]

Construction inspections take place during several points in the construction sequence, specific to the type of LID BMP, but at a minimum should be done weekly and include the following:

  1. During site preparation, prior to BMP excavation and grading to ensure the CDA is stabilized and/or flow diversion devices are in place and confirm that construction materials meet design specifications
  2. At completion of excavation and grading, prior to backfilling and installation of pipes to ensure depths, slopes and elevations are acceptable
  3. At completion of installation of geotextile/pipes, prior to completion of backfilling to ensure slopes and elevations are acceptable
  4. After final grading, prior to surface course installation to ensure depths, slopes and elevations are acceptable
  5. Prior to hand-off points in the construction sequence when the contractor responsible for the work changes (i.e., hand-offs between the storm sewer servicing, paving, building and landscaping contractors)
  6. After every large storm event (e.g., 15 mm rainfall depth or greater) to ensure ESCs and pretreatment or flow diversion devices are functioning and adequately maintained. View the table below, which describes critical points during the construction sequence when inspections should be performed prior to proceeding further. You can also download and print the table here


A pretreatment device (catchbasin insert) upstream of an underground infiltration system inlet in need of cleaning out. These devices are designed to limit the amount of trash, debris, sediment, oil and grease entering the infiltration system, which helps to prevent clogging and maintain its drainage performance (Source: TRCA, 2018<ref name= "example1" /).
Underground Infiltration Systems: Construction Inspections

Construction Sequence Step & Timing

Inspection Item

Observations*
Site Preparation - after site clearing and grading, prior to BMP excavation and grading, prior to BMP excavation and grading Natural heritage system and tree protection areas remain fenced off
ESCs protecting BMP layout area are installed properly
CDA is stabilized or runoff is diverted around BMP layout area
BMP layout area has been cleared and is staked/delineated
Benchmark elevation(s) are established nearby
Construction materials have been confirmed to meet design specifications
BMP Excavation and Grading - prior to backfilling and installation of geotextile/pipes Excavated soil is stockpiled outside the CDA
Excavation location, footprint, depth and slope are acceptable
Compaction of subsoil where load-bearing portions of the system will be installed is acceptable
Excavation bottom and sides roughened to reduce smearing and compaction
BMP Installation – after installation of geotextile/ pipes/structures, prior to completion of backfilling Installation of structural components (e.g., control manhole, maintenance hatches) is acceptable
Sub-drain trench dams installed correctly (location, elevation)
Installations of sub-drain pipes (e.g., locations, elevations, slopes) & maintenance access hatches are acceptable