Construction

From LID SWM Planning and Design Guide
Jump to navigation Jump to search

Overview[edit]

  • Importance of construction inspections


STEP divides the construction process for LID practices into five categories:

  1. Pre-construction
  2. Excavation and grading
  3. Backfill granular, utilities and pipes
  4. Finishing grades: inlet, outlet, and surface layer
  5. Post-construction

The first three categories of construction process are fundamentally the same for all ground-level LID types. For example, the STEP-recommended processes for excavation do not differ between practice type: excavation is excavation, whether it is for a bioretention or a permeable paver facility.