Before beginning the sizing calculations most of the following parameters must be known or estimated. The exceptions are the depth (d) and Permeable area (P), as only one of these is required to find the other. Note that some of these parameters are limited:

  • The maximum total depth will be limited by construction practices i.e. not usually > 2 m.
  • The maximum total depth may be limited by the conditions underground e.g. the groundwater or underlying geology/infrastructure.
  • The minimum total depth may be limited by the need to support vegetation i.e. not < 0.6 m.


Inputs
Symbol Units Parameter
D hrs Duration of design storm (for MOECC volume based caclulations set to 1)
i mm/hr Intensity of design storm (for MOECC volume based calculations use whole storm depth (link to map))
q mm/hr Infiltration coefficient, calculated from measured infiltration rate and applied safety factor
n - Porosity, as measured (or default to 0.35)
I m2 Impermeable area i.e. catchment
d m depth of Infiltration facility or BMP
P m2 Permeable area i.e. area of the facility or BMP

To calculate the required depth, where the area of the facility is constrained:

To calculate the require facility area or footprint where the depth is constrained: