Difference between revisions of "Addressing deficiencies"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 1: Line 1:
===Post-Construction: Addressing deficiencies===
===Post-construction: addressing deficiencies===
Prior to passing responsibility to the landowner, contractors must ensure that any deficiencies in the LID feature’s construction are addressed. Keep in-mind what mistakes must be avoided during each construction task.
Prior to passing responsibility to the landowner, contractors must ensure that any deficiencies in the LID feature’s construction are addressed. Keep in-mind what mistakes must be avoided during each construction task.

Revision as of 14:24, 22 July 2022

Post-construction: addressing deficiencies[edit]

Prior to passing responsibility to the landowner, contractors must ensure that any deficiencies in the LID feature’s construction are addressed. Keep in-mind what mistakes must be avoided during each construction task.