Addressing deficiencies

From LID SWM Planning and Design Guide
Revision as of 14:24, 22 July 2022 by JamesCowan (talk | contribs)
Jump to navigation Jump to search

Post-construction: addressing deficiencies[edit]

Prior to passing responsibility to the landowner, contractors must ensure that any deficiencies in the LID feature’s construction are addressed. Keep in-mind what mistakes must be avoided during each construction task.