Page history
Jump to navigation
Jump to search
3 August 2022
→Base course (permeable pavements)
m−41
→Base course
m+22
Created page with "===Base course=== In permeable pavement systems, the base course lies on top of the sub-base reservoir. See the Permeable pavements: Specifications page for base material specifications. The construction steps, key inspection points, and mistakes to avoid for the base course are the same as the guidance given in the storage reservoir section. However, depending on the municipality and the design, compaction of the base course may be required. For example, the City of..."
+931