Changes

Jump to navigation Jump to search
m
Line 21: Line 21:

On commercial, industrial and multi-unit developments, a popular choice is to integrate [[bioretention]] into parking lot landscaped areas. These distributed cells typically accept sheet flow through multiple curb cuts, have shallow depression storage ≤ 100 mm, and a total area of 5 -200 m<sup>2</sup>. Although many parking lot schemes include long linear bioretention cells (≥ 0.6 m wide), infiltration is optimized by having a level grade and a level base, unlike a [[Bioswales|bioswale]].
On commercial, industrial and multi-unit developments, a popular choice is to integrate [[bioretention]] into parking lot landscaped areas. These distributed cells typically accept sheet flow through multiple curb cuts, have shallow depression storage ≤ 100 mm, and a total area of 5 -200 m<sup>2</sup>. Although many parking lot schemes include long linear bioretention cells (≥ 0.6 m wide), infiltration is optimized by having a level grade and a level base, unlike a [[Bioswales|bioswale]].
===Winter maintenance===
Salt can be damaging to the planting in parking lot bioretention. To help minimize this, bioretention practices adjacent to parking areas should always have an [[underdrain]] and salt use be reduced through good design and planning of the [[salt management| parking lot]].


==Gallery==
==Gallery==
Line 39: Line 42:
*[[Choking layer]]
*[[Choking layer]]
*[[Reservoir_aggregate|Reservoir]]
*[[Reservoir_aggregate|Reservoir]]
*[[underdrain]]
722

edits

Navigation menu