Changes

Jump to navigation Jump to search
m
no edit summary
Line 21: Line 21:
*''A<sub>p</sub>'' = Area of the infiltration practice in m<sup>2</sup>
*''A<sub>p</sub>'' = Area of the infiltration practice in m<sup>2</sup>
*''d'' = Depth of infiltration practice in m.}}
*''d'' = Depth of infiltration practice in m.}}
==Step 2==
Fit the bioretention facility into the site plan. It is necessary to have an idea of the perimeter of the facility.
Narrow, linear cells drain faster than round or blocky footprint geometries. 


==Step 3==
==Step 3==

Navigation menu