Changes

Jump to navigation Jump to search
Line 15: Line 15:
*''A<sub>p</sub>'' = Area of the infiltration practice in m<sup>2</sup>
*''A<sub>p</sub>'' = Area of the infiltration practice in m<sup>2</sup>
*''A<sub>c</sub>'' = Catchment area in m<sup>2</sup>}}
*''A<sub>c</sub>'' = Catchment area in m<sup>2</sup>}}
 
----
Apply an appropriate safety correction factor to the measured infiltration rate:
:<math>q'=\frac{q}{SCF}</math>
:<math>q'=\frac{q}{SCF}</math>
 
{{Plainlist|1=Where:
*''q''' = Infiltration coefficient in mm/hr (accounting for SCF)
*''SCF'' = Safety correction factor}}
----




Line 33: Line 37:
*''i'' = Intensity of design storm in mm/hr
*''i'' = Intensity of design storm in mm/hr
*''q''' = Infiltration coefficient in mm/hr (accounting for SCF)
*''q''' = Infiltration coefficient in mm/hr (accounting for SCF)
*''SF'' = Safety factor
*''SCF'' = Safety correction factor
*''V<sub>R</sub>'' = Void ratio (porosity), as measured (or default to 0.35 for all aggregates)*
*''V<sub>R</sub>'' = Void ratio (porosity), as measured (or default to 0.35 for all aggregates)*
*''R'' = Ratio of catchment area (''A<sub>c</sub>'') to BMP footprint area (A<sub>p</sub>) syn. I/P ratio.   
*''R'' = Ratio of catchment area (''A<sub>c</sub>'') to BMP footprint area (A<sub>p</sub>) syn. I/P ratio.   

Navigation menu