Changes

Jump to navigation Jump to search
Line 49: Line 49:

==Calculate drawdown time==
==Calculate drawdown time==
To calculate the time (''t'') to fully drain the facility:
<math>t=\frac{nd}{q}</math>


[[file:Hydraulic radius.png|thumb|Three footprint areas of 9 m<sup>2</sup>.<br>
[[file:Hydraulic radius.png|thumb|Three footprint areas of 9 m<sup>2</sup>.<br>
From left to right x = 12 m, x = 14 m, and x = 16 m]]
From left to right x = 12 m, x = 14 m, and x = 16 m]]
For some geometries (e.g. particularly deep facilities or linear facilities), it may be preferred to also account for lateral infiltration.
The 3 dimensional equations make use of the hydraulic radius (''P''/''x''), where ''x'' is the perimeter (m) of the facility. <br>
The 3 dimensional equations make use of the hydraulic radius (''P''/''x''), where ''x'' is the perimeter (m) of the facility. <br>
Maximizing the perimeter of the facility directs designers towards longer, linear shapes such as [[infiltration trenches]] and [[bioswales]].   
Maximizing the perimeter of the facility directs designers towards longer, linear shapes such as [[infiltration trenches]] and [[bioswales]].   
Line 63: Line 58:
:<math>d=a[e^{\left ( -bD \right )} -1]</math>
:<math>d=a[e^{\left ( -bD \right )} -1]</math>
Where
Where
<math>a=\frac{P}{x}-\frac{i I}{P q}</math>
<math>a=\frac{A_{p}}{x}-\frac{i I}{A_{p}q'}</math>
and  
and  
<math>b=\frac{xq}{nP}</math>
<math>b=\frac{xq}{nP}</math>

Navigation menu