Changes

Jump to navigation Jump to search
m
no edit summary
Line 18: Line 18:
|If the slope > 3% a series of [[Check dams]] or weirs should be included in the design.  
|If the slope > 3% a series of [[Check dams]] or weirs should be included in the design.  
|-
|-
!colspan = "2" style="background: darkcyan; color: white; align = center"|'''Soil (bioretention filter media)'''
!colspan = "2" align = center"|'''Soil (bioretention filter media)'''
|-
|-
|Thickness (mm)
|Thickness (mm)
Line 41: Line 41:
|Suggested range 50 - 60 <ref name = SWMM/>
|Suggested range 50 - 60 <ref name = SWMM/>
|-
|-
!colspan = "2" style="background: darkcyan; color: white; align = center"|'''Storage'''
!colspan = "2" align = center"|'''Storage'''
|-
|-
|Thickness (mm)
|Thickness (mm)
Line 56: Line 56:
|-
|-
|Design drawdown time (hrs)
|Design drawdown time (hrs)
|Recommend 48 hours?
|Also known as [['drainage time']]
|-
|-
!colspan = "2" style="background: darkcyan; color: white; align = center"|'''Drain (underdrain)'''
!colspan = "2" align = center"|'''Drain (underdrain)'''
|-
|-
|Flow coefficient
|Flow coefficient

Navigation menu