Changes

Jump to navigation Jump to search
no edit summary
Line 2: Line 2:
The storage reservoir layer holds and directs the stormwater into the underlying/native soils. The LID facilities, if applicable, should be filled with uniformly graded, washed stone (20 mm – 50 mm) that provides 30 to 40% void space.  
The storage reservoir layer holds and directs the stormwater into the underlying/native soils. The LID facilities, if applicable, should be filled with uniformly graded, washed stone (20 mm – 50 mm) that provides 30 to 40% void space.  


‘’’Construction steps:’’’
‘''Construction steps:’’’
#Backfill material from outside of the LID facility to avoid compaction and sediment entering the facilities. Use a slinger truck if possible.
#Backfill material from outside of the LID facility to avoid compaction and sediment entering the facilities. Use a slinger truck if possible.
#Place the material to the elevation and thickness as per the design specifications.
#Place the material to the elevation and thickness as per the design specifications.

Navigation menu