Changes

Jump to navigation Jump to search
m
Line 64: Line 64:
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:
The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows:


Result
{| class="wikitable"
{| class="wikitable"
! BMP Footprint (m²)
! BMP Footprint (m²)
Line 73: Line 71:
| < 50 || 1 || 1
| < 50 || 1 || 1
|-
|-
| 50 – 900 || 1 || 2
|rowspan = 2| 50 – 900 || 1 || 2
|-
|-
|  || 2 || 0
|  || 2 || 0
|-
|-
| > 900 || 1 every 450 m² || 2 every 450 m2
| rowspan = 2|> 900 || 1 every 450 m² || 2 every 450 m2
|-
|-
|  || 2 every 450 m² || 0
|  || 2 every 450 m² || 0

Navigation menu