Changes

Jump to navigation Jump to search
m
no edit summary
Line 1: Line 1:
==Floodplain Mapping and Documentation Minimum Requirements==
==Site Description==
* Location (key plan, municipal address, nearest roads, watershed and subwatershed);
* Existing Conditions (land use on site and surrounding areas);
* Natural Heritage features;
* Proposed Conditions;
* Drainage Area (for the site, tributary and watershed);
* Watercourses, wetlands present on site, and type (permanent or intermittent);
* Drainage patterns and ultimate drainage location/outfall;
==Background Information==
* Pre-submission meeting verification;
* Reports from pre-consultation with MOECC and other agencies (especially related LID credits);
* Watershed plans;
* Sub-Watershed plans;
* Master drainage plans (MDPs);
* Other previous reports and relevant SWM requirements;
* Existing models;
* Geotechnical report;
* Hydrogeological report;
 
 
 
===Floodplain mapping and documentation minimum requirements==
# Hydraulic sections with regulated floodplain elevations and cross-section identification;
# Hydraulic sections with regulated floodplain elevations and cross-section identification;
# Existing and proposed floodplain delineation;
# Existing and proposed floodplain delineation;

Navigation menu