Changes

Jump to navigation Jump to search
m
no edit summary
Line 17: Line 17:
* Geotechnical report;
* Geotechnical report;
* Hydrogeological report;
* Hydrogeological report;
==Figures and drawings==
* Location plan in the report;
* Key Plan on the drawings;
* All watercourses and names of watercourses shown on all figures and drawings;
* Pre-development and post-development drainage plans for hydrologic model(s) which include:
**Existing contours;
**Drainage direction (minor and major system);
**Catchments ID's;
**Areas and imperviousness;
**Uncontrolled areas;
**100 year capture;
**Site outlets; and
**SWM facility location and associated tributary areas;
* Model schematics;
* Storm drainage, grading and general servicing plans;
* SWM facility design drawings and details;
* Erosion and sediment control plans;




 
===Floodplain mapping and documentation minimum requirements===
===Floodplain mapping and documentation minimum requirements==
# Hydraulic sections with regulated floodplain elevations and cross-section identification;
# Hydraulic sections with regulated floodplain elevations and cross-section identification;
# Existing and proposed floodplain delineation;
# Existing and proposed floodplain delineation;

Navigation menu