Changes

Jump to navigation Jump to search
m
Line 47: Line 47:
# Natural features such as watercourses and wetlands;
# Natural features such as watercourses and wetlands;
# Floodplain mapping and supporting documentation signed and stamped by a P.Eng.
# Floodplain mapping and supporting documentation signed and stamped by a P.Eng.
==Survey Documentation Minimum Requirements==
===Survey documentation minimum requirements===
For any submission which contains drawings or figures that present survey information, the following list of minimum requirements must be included:
For any submission which contains drawings or figures that present survey information, the following list of minimum requirements must be included:
# Document with text descriptor identifying overall approach and methodology;
# Document with text descriptor identifying overall approach and methodology;
Line 64: Line 64:
# Digital copy of the survey data when applicable; and
# Digital copy of the survey data when applicable; and
# Submission components to be stamped and signed by an OLS, P.Eng. or C.E.T. as relevant.
# Submission components to be stamped and signed by an OLS, P.Eng. or C.E.T. as relevant.
==Geospatial Data Submission Minimum Requirements==
==Geospatial Data Submission Minimum Requirements==
For a submission which contain drawings, figures, reports, modelling and / or memos that present geospatial information and its analysis; the following list of minimum requirements must be included:
For a submission which contain drawings, figures, reports, modelling and / or memos that present geospatial information and its analysis; the following list of minimum requirements must be included:

Navigation menu