Changes

Jump to navigation Jump to search
m
Line 20: Line 20:
==Figures and drawings==
==Figures and drawings==
* Location plan in the report;
* Location plan in the report;
* Key Plan on the drawings;
* Key plan on the drawings;
* All watercourses and names of watercourses shown on all figures and drawings;
* All watercourses and names of watercourses shown on all figures and drawings;
* Pre-development and post-development drainage plans for hydrologic model(s) which include:
* Pre-development and post-development drainage plans for hydrologic model(s) which include:
Line 35: Line 35:
* SWM facility design drawings and details;
* SWM facility design drawings and details;
* Erosion and sediment control plans;
* Erosion and sediment control plans;
==Design Information==
==Design Information==
* Consistent hydrology modelling to be utilized for each development application and/or consistent with MESP/MSP/Studies.
* Consistent hydrology modelling to be utilized for each development application and/or consistent with MESP/MSP/Studies.

Navigation menu