Changes

Jump to navigation Jump to search
m
no edit summary
Line 1: Line 1:
The following, comprehensive list is presented as a basis for discussion between regulatory authorities and design practitioners.
The following, comprehensive list is presented as a basis for discussion between regulatory authorities and design practitioners.
 
{{TOClimit|2}}
==Site Description==
==Site Description==
* Location (key plan, municipal address, nearest roads, watershed and subwatershed);
* Location (key plan, municipal address, nearest roads, watershed and subwatershed);
Line 154: Line 154:
*External drainage conveyance (100 year and Regional);
*External drainage conveyance (100 year and Regional);
===Quality control===
===Quality control===
*Level of Protection;
*Level of protection;
*Drainage Area to Facility in hectares;
*Drainage area to facility in hectares;
*Percentage Impervious – total and directly connected areas;
*Percentage impervious – total and directly connected areas;
*SWM Facility Monitoring and Maintenance Requirements;
*SWM facility monitoring and maintenance requirements;


==Hazard land management==
==Hazard land management==

Navigation menu