Changes

Jump to navigation Jump to search
m
no edit summary
Line 3: Line 3:
[[File:Bill's double ring.jpg|thumb|Double ring infiltrometer in use]]
[[File:Bill's double ring.jpg|thumb|Double ring infiltrometer in use]]
===Packing list===
===Packing list===
Small ring (28 – 32 cm)
* Small ring (28 – 32 cm)
Large ring (53 – 57 cm)
* Large ring (53 – 57 cm)
Sledge hammer for driving rings into ground
* Sledge hammer for driving rings into ground
Wooden block to distribute force when driving rings into ground
* Wooden block to distribute force when driving rings into ground
Level  
* Level  
Two metal rulers with clips to secure
* Two metal rulers with clips to secure
Container for water
* Container for water (will water need transporting to site? take more than you think you'll need)
Screwdriver or similar implement to dislodge rocks
* Screwdriver or similar implement to dislodge rocks
** Tarpaulin for working/sitting on?
** Sunscreen and/or umbrella!
===Installation===
===Installation===
# Choose or create clear, level ground at the desired test location.  
# Choose or create clear, level ground at the desired test location.  

Navigation menu