[[File:P1000154.JPG|300x|thumb|Permeable pavement parking lot at Credit Valley Conservation's Head Office in Mississauga (Photo source: CVC, 2017).
[[File:P1000154.JPG|300x|thumb|Permeable pavement parking lot at Credit Valley Conservation's Head Office in Mississauga (Photo source: CVC, 2017).]]
==Overview==
==Overview==
This section gives guidance for project managers, engineers, and contractors on the finishing grades and surface layer installation steps required for successful construction of permeable pavements.  
This section gives guidance for project managers, engineers, and contractors on the finishing grades and surface layer installation steps required for successful construction of permeable pavements.  