[[File:Green Roof - main pg toronto.PNG|thumb|500px|[[Green Roof]] located in Toronto, ON. To read more about the life cycle costs and savings associated with building and owning a green roof in the GTA, check out the STEP report [https://sustainabletechnologies.ca/app/uploads/2013/03/GR_york_fullreport.pdf "An Economic Analysis of Green Roofs", here]. (Photo Source: STEP, 2007<ref>STEP. 2007. AN ECONOMIC ANALYSIS OF GREEN ROOFS: Evaluating the costs and savings to building owners in Toronto and surrounding regions. ©Toronto and Region Conservation Authority. https://sustainabletechnologies.ca/app/uploads/2013/01/GR_Econ_Full-document.pdf</ref>).]]
[[File:Green_Roof_-_main_pg_toronto.PNG|thumb|500px|[[Green roof]] located in Toronto, ON. To read more about the life cycle costs and savings associated with building and owning a green roof in the GTA, check out the STEP report [https://sustainabletechnologies.ca/app/uploads/2013/03/GR_york_fullreport.pdf "An Economic Analysis of Green Roofs", here]. (Photo Source: STEP, 2007<ref>STEP. 2007. AN ECONOMIC ANALYSIS OF GREEN ROOFS: Evaluating the costs and savings to building owners in Toronto and surrounding regions. ©Toronto and Region Conservation Authority. https://sustainabletechnologies.ca/app/uploads/2013/01/GR_Econ_Full-document.pdf</ref>).]]


{{TOClimit|2}}
{{TOClimit|2}}
Line 28: Line 28:
==Construction Costs==
==Construction Costs==


[[File:Construction Breakdown EnhancedSwales Full Infil.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - Full Infiltration Design, 25 mm Treatment''']]
[[File:Construction Breakdown GreenRoof No Infil.PNG|thumb|center|950px|'''Construction Costs Per Unit Drainage Area (CAD$/m<sup>2</sup>) - No Infiltration Design, 25 mm Treatment''']]




Line 34: Line 34:



Above you can find a cost breakdown of a 1000m<sup>2</sup> LID configuration:<br>
Above you can find a cost breakdown of a 2000m<sup>2</sup> LID configuration:<br>
#[[Enhanced swales|Enhanced Swales: Full Infiltration]]  
#[[Enhanced swales|Enhanced Swales: Full Infiltration]]  


Material & Installation expenses represent the largest portion of total construction costs (50%).
Material & Installation expenses represent the largest portion of total construction costs (85%).


==Life Cycle Costs==
==Life Cycle Costs==
Below are capital and life cycle cost estimates for the [[Enhanced swales]] Full Infiltration configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 45% of total life cycle costs over the 25-year evaluation period, and increase to 59% of total life cycle costs over the 50-year period, due to increased levels of litter removal, watering (establishment period - years 1 & 2 / annually and / drought watering) cleaning out and vacuuming of the catchbasin, mowing, replacement of sod, weeding and pruning of the BMP's planted [[vegetation]].
Below are capital and life cycle cost estimates for the [[Green roofs]] with a No Infiltration configuration over 25- and 50-year time periods. The estimates of maintenance and rehabilitation (life cycle) costs represent net present values. Operation and maintenance costs are predicted to represent 4% of total life cycle costs over the 25-year evaluation period, and increase to only 6% of total life cycle costs over the 50-year period. Maintenance costs associated that make up a smaller percentage of total capital include, litter removal, watering (establishment period - years 1 & 2 / annually and / drought watering), weeding and pruning of the BMP's planted [[vegetation]], plant replacement starting in tear 2, green roof irrigation line testing, membrane leak detection testing and repair of the membrane starting in Year 10.


===25-Year life cycle cost break down===
===25-Year life cycle cost break down===


[[File:25yr LCCT EnhancedSwales Full Infil.PNG|thumb|center|900px|'''Enhances Swales: Full Infiltration''']]
[[File:25yr LCCT GreenRoof No Infil.PNG|thumb|center|900px|'''Enhances Swales: Full Infiltration''']]


<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
Line 50: Line 50:
===50-Year life cycle cost break down===
===50-Year life cycle cost break down===


[[File:50yr LCCT EnhancedSwales Full Infil.PNG|thumb|center|900px|'''Enhances Swales: Full Infiltration''']]
[[File:50yr LCCT GreenRoof No Infil.PNG|thumb|center|900px|'''Enhances Swales: Full Infiltration''']]


<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>
<small>'''Note:''' Click on each image to enlarge to view associated life cycle cost estimate.</small><br>


==Cost Summary Tables==
==Cost Summary Tables==
Total life cycle cost estimates for the [[Enhanced swale]] Full Infiltration design configuration is ($23,451.36), makign it one of the cheapest LID BMP options.<br>
Total life cycle cost estimates for the [[Green roofs]] No Infiltration design configuration is ($740,943.00), making it one of the most expensive LID BMP options. This is due to the costs of expensive components such as, waterproof membrane and flashing, roof insulation required, drainage layer and filter cloth, growing medium, the plants themselves and crane requirements for construction.<br>


It is notable that a sensitivity analysis was conducted in 2019 to compare construction cost estimates generated by the tool to actual costs of implemented projects. '''The analysis found that tool estimates were typically within ±14% of actual construction costs'''<ref>Credit Vally Conservation (CVC). 2019. Life-cycle costing tool 2019 update: sensitivity analysis. Credit Valley Conservation, Mississauga, Ontario. https://sustainabletechnologies.ca/app/uploads/2020/04/LCCT-Sensitivity-Analysis_March2020.pdf</ref>
It is notable that a sensitivity analysis was conducted in 2019 to compare construction cost estimates generated by the tool to actual costs of implemented projects. '''The analysis found that tool estimates were typically within ±14% of actual construction costs'''<ref>Credit Vally Conservation (CVC). 2019. Life-cycle costing tool 2019 update: sensitivity analysis. Credit Valley Conservation, Mississauga, Ontario. https://sustainabletechnologies.ca/app/uploads/2020/04/LCCT-Sensitivity-Analysis_March2020.pdf</ref>


===Full Infiltration===
===No Infiltration===
[[File:CVC Office, Grass Swale.JPG|500px|thumb|Enhanced Grass [[swale]] in CVC headquarters parking lot, Mississauga ON.]]
[[File:Layers green roof.PNG|thumb|right|500px|Generalized cross-section view of a green roof showing key components and common layers that make up this LID BMP (TRCA, 2018).<ref name="example1"> TRCA. 2018. Fact Sheet - Inspection and Maintenance of Stormwater Best Management Practices: Green Roofs. https://sustainabletechnologies.ca/app/uploads/2018/02/Green-Roofs-Fact-Sheet.pdf</ref>]]


[[File:Design Table EnhancedSwales Full Infil.PNG|700px]]<br>
[[File:Design Table GreenRoof No Infil.PNG|700px]]<br>
</br>
</br>


==References==
==References==