Changes

Jump to navigation Jump to search
no edit summary
Line 72: Line 72:
Designers should consult local utility design guidance for the horizontal and vertical clearances required between storm drains.
Designers should consult local utility design guidance for the horizontal and vertical clearances required between storm drains.


===Karst===
===[[Karst]]===
Infiltration trenches, chambers and soakaways are not suitable in areas of known or implied karst topography.  
Infiltration trenches, chambers and soakaways are not suitable in areas of known or implied karst topography.


===Setback from Buildings===
===Setback from Buildings===
Line 179: Line 179:
|}
|}


==Performance==
===Water Quality===
Take a look at the [[Infiltration Trench: Performance]] page by clicking below for further details about STEPs collected performance results for Infiltratio ntrench practices located within TRCA's, CVC's and LSRCA's watersheds: <br>
</br>
{{Clickable button|[[File:TP effluent comparison.PNG|150 px|link=https://wikidev.sustainabletechnologies.ca/wiki/Infiltration_Trench:_Performance]]}}


==Materials==
==Materials==

Navigation menu