Line 354: Line 354:
Assumptions for the above costs and the following table below are based on the following:
Assumptions for the above costs and the following table below are based on the following:


*For rainwater cisterns it is assumed that no rehabilitation work will be needed to maintain acceptable storage and drainage performance over a 50 year period of operation (40 for plastic cisterns), given that pretreatment devices are in place and are being adequately maintained. The annual average maintenance cost value represents an average of routine maintenance tasks, as outlined in Table 7.28. All cost value estimates represent the NPV as the calculation takes into account average annual interest (2%) and discount (3%) rates over the evaluation time periods.
*For rainwater cisterns it is assumed that no rehabilitation work will be needed to maintain acceptable storage and drainage performance over a 50 year period of operation (40 for plastic cisterns), given that pretreatment devices are in place and are being adequately maintained. The annual average maintenance cost value represents an average of routine maintenance tasks, as outlined in Rainwater Harvesting: Key Components, Descriptions and Routine I&M Requirements table above. All cost value estimates represent the NPV as the calculation takes into account average annual interest (2%) and discount (3%) rates over the evaluation time periods.
 
*Life cycle cost estimates have been generated for two design variations that can be used year-round: underground concrete cistern; and indoor plastic cistern systems. For each design variation, life cycle cost estimates have been calculated for two level-of-service scenarios: the minimum recommended frequency of inspection and maintenance tasks in the Per-task cost estimates for maintenance and rehabilitation of rainwater harvesting features table above to provide an indication of the potential range. Only the indoor plastic cistern requires rehabilitation within the 50 year evaluation period. At year 40 it is assumed the plastic cistern is replaced with anew one.  
**Costs include overhead and inflation to represent contractor pricing. It was assumed the practice is part of a new development (i.e., not a retrofit), thereby excluding (de)mobilization costs unless a particular piece of equipment would not normally have been present at the site. Additionally, it was assumed that excavated soil associated with construction of the BMP would be reused elsewhere on site. Overhead costs were presumed to consist of construction management (4.5%), design (2.5%), small tools (0.5%), clean up (0.3%) and other (2.2%).
*For all scenarios, the roof area that drains into the rainwater harvesting cistern is 2,000 m<sup>2</sup>. The water storage capacity of the cistern is assumed to be 23,000 L. Both cistern systems include a dual plumbing distribution system, an 81.2 LPM submersible pump and a 439 L expansion tank. The systems also include a float switch to prevent the pump from dry running, a top-up float switch and associated wring, a solenoid valve, air gap to prevent backflow, as well as backflow preventer at the premise boundary, a water meter and a water hammer arrestor. The rainwater is used for toilet flushing of 260 occupants. It is assumed that two hose bibs are used on average 14 minutes per day from April to September. The underground concrete cistern is installed adjacent to the building. The plastic cistern is stored inside the building, so no excavation is required to install/uninstall it.  
*For maintenance frequencies and requirements and the life span of each practice are based on both literature and practical experience. Life cycle and associated maintenance costs are evaluated over a 50 year timeframe, which is the typical period over which infrastructure decisions are made.
*Estimates of the life cycle costs for the two rainwater cistern system design variations in Canadian dollars per unit CDA ($/m<sup>2</sup>) are presented in the table below. The LID Life Cycle Costing Tool allows users to select what BMP type and design variation applies, and to use the default assumptions to generate planning level cost estimates. Users can also input their own values relating to a site or area, design, unit costs, and inspection and maintenance task frequencies to generate customized cost estimates, specific to a certain project, context or stormwater infrastructure program.  
*For [[bioretention]], it is assumed that some rehabilitation (e.g., rehabilitative maintenance) work will be needed on the filter bed surface once the BMP reaches 25 and 50 years of age in order to maintain functional drainage performance at an acceptable level. Included in the rehabilitation costs are (de)mobilization costs, as equipment would not have been present on site. Design costs were not included in the rehabilitation as it was assumed that the original LID practice design would be used to inform this work. The annual average maintenance cost does not include rehabilitation costs and therefore represents an average of routine maintenance tasks, as outlined in the Table under section, [[Inspection and Maintenance: Bioretention & Dry Swales#Routine Maintenance - Key Components and I&M Tasks|Routine Maintenance - Key Components and I&M Tasks]] above. All cost value estimates represent the net present value (NPV) as the calculation takes into account average annual interest (2%) and discount (3%) rates over the evaluation time periods.
*For indoor plastic cistern systems it is assumed that replacement of the cistern itself is needed once it reaches 40 years of age. Replacement of the cistern is assumed to typically involve the following tasks and associated costs:
*For all bioretention design variations, the CDA has been defined as a 2,000 m2 impervious pavement area plus the footprint area of a bioretention cell that is 133 m2 in size, as per design recommendations. The impervious area to pervious area ratio (I:P ratio) used to size the BMP footprint is 15:1, which is the maximum ratio recommended in the LID SWM Planning and Design Guide (CVC & TRCA, 2010)<ref>CVC and TRCA. 2010. Low Impact Development Stormwater Management Planning and Design Guide. Version 1.0. https://cvc.ca/wp-content/uploads/2014/04/LID-SWM-Guide-v1.0_2010_1_no-appendices.pdf</ref>. It is assumed that water drains to the cell through curb inlets spaced 6 m apart with
**Dismantle all portions of the system within or connected to the cistern;
stone cover on the filter bed at the inlets to dissipate the energy of the flowing water.
**Replace the plastic cistern with a new one that meets design specifications;
*While orientation (i.e., cell versus swale) and choice of components (e.g., inlet/outlet structures etc.) can vary widely, design variations for bioretention practices can be broken down into three main categories. They can be designed to drain through infiltration into the underlying subsoil alone (i.e., Full Infiltration design, no sub-drain), through the combination of a sub-drain and infiltration into the underlying subsoil (i.e., Partial Infiltration design, with a sub-drain), or through a sub-drain alone (i.e., No Infiltration or “filtration only” design, with a sub-drain and impermeable liner). For Full Infiltration systems, an overflow is provided for storms up to 37 mm based on a subsoil infiltration rate of 20 mm/hour. Two standpipe wells are part of the design (one subdrain inspection/flushing port at the upstream end and one sub-surface water storage reservoir monitoring well at the downstream end). Partial Infiltration systems have a sub-surface water storage reservoir with a perforated pipe sub-drain within it. The depth of the reservoir is sized to store flow from a 25 mm rain event over the CDA based on native soil infiltration rate of 10 mm/hour. The No Infiltration system includes an impermeable liner between the base and sides of the BMP and surrounding native sub-soil, to prevent infiltration.  
**Reassemble the system, re-using existing components;
*Estimates of the life cycle costs of bioretention and dry swales in Canadian dollars per unit CDA ($/m2) are presented in the table below. [[Cost analysis resources|LID Life Cycle Costing Tool]] allows users to select what BMP type and design variation applies, and to use the default assumptions to generate planning level cost estimates.
**Construction and Assumption inspection work associated with the rehabilitation work (including cistern pump testing). <br>
**Users can also input their own values relating to a site or area, design, unit costs, and inspection and maintenance task frequencies to generate customized cost estimates, specific to a certain project, context or stormwater infrastructure program.
**For all BMP design variations and maintenance scenarios, it is assumed that rehabilitation of part or all of the filter bed surface will be necessary once the BMP reaches 25 and 50 years of age to maintain acceptable surface drainage performance (e.g., surface ponding drainage time). Filter bed rehabilitation for bioretention and dry swales is assumed to typically involve the tasks outlined under section, [[Inspection and Maintenance: Bioretention & Dry Swales#Routine Maintenance - Key Components and I&M Tasks|Routine Maintenance - Key Components and I&M Tasks]] above.<br>
</br>
</br>


[[File:Life cycle cost for all variations.PNG|thumb|center|900px|Life cycle cost estimates for all variation types of [[bioretention]] and [[Dry swale|dry swales]] under minimum and high frequency scenarios (in 2016 $ figures).<ref>TRCA. 2018. Inspection and Maintenance of Stormwater Best Management Practices. Bioretention - Fact Sheet. https://sustainabletechnologies.ca/app/uploads/2018/02/Bioretention-and-Dry-Swales-Fact-Sheet.pdf</ref>]]
[[File:Life cycle cost all variations RWH.PNG|thumb|center|900px|Life cycle cost estimates for both underground (buried) concrete cisterns and indoor plastic cisterns under minimum and high frequency scenarios (in 2016 $ figures)<ref name="example1" />.]]


'''Notes:'''
'''Notes:'''
<small>
#Estimated life cycle costs represent NPV of associated costs in Canadian dollars per squaremetre of CDA ($/m<sup>2</sup>).
#Average annual maintenance cost estimates represent NPV of all costs incurred over the time period and do not include rehabilitation costs.
#Over a 50 year evaluation period, average annual maintenance cost estimates for the High Frequency maintenance scenario are 59% and 56% higher than the Minimum Recommended Frequency maintenance scenario for underground concrete cistern and indoor plastic cistern systems respectively.
#Rehabilitation costs for the indoor plastic cistern system (i.e., replacing the cistern structure) are estimated to be 9.67% of the original construction costs, regardless of the maintenance frequency.
#Maintenance costs over a 25 year time period for underground concrete cistern systems are estimated to be 45.8% of the original construction cost for the Minimum Recommended Frequency maintenance scenario, and 89.4% for the High Frequency maintenance scenario.
#Maintenance costs over a 25 year time period for indoor plastic cistern systems are estimated to be 47.7% of the original construction cost for the Minimum Recommended Frequency maintenance scenario, and 98.0% for the High Frequency maintenance scenario.
#Maintenance costs over a 50 year time period for underground concrete cistern systems are estimated to be 0.918 times the original construction cost for the Minimum Recommended Frequency maintenance scenario, and 1.59 times for the High Frequency maintenance scenario.
#Maintenance costs over a 50 year time period for indoor plastic cistern systems are estimated to be 1.07 times the original construction cost for the Minimum Recommended Frequency maintenance scenario, and 1.84 times for the High Frequency maintenance scenario.
</small>
==Inspection Field Data Sheet==
Feel free to '''download''' (downward facing arrow on the top righthand side) and '''print''' (Pinter emoticon on top right hand side) the following Rainwater Cisterns/Harvesting Inspection Field Data Form developed by TRCA, STEP and its partners for the [https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide]<ref>STEP. 2016. Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide. https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf</ref>.
The 3 page document prompts users to fill out details previously mentioned above on this page in other sections about various zones associated with [[Rainwater harvesting]] systems and [[rain barrels]], along with other associated features (i.e. inlets, CDA, pretreatment, outlets, access hatches, etc.) and describe why each area is a pass or fail, and if remediate action is required and under what timeframe it would be completed by. Furthermore, the forms prompt the reviewer to determine what type of  inspection is being conducted for the feature in question: Construction (C), Routine Operation (RO), Maintenance Verification (MV), or Performance Verification (PV). <br>
<br>
[[File:Access Hatch RWH.PNG|thumb|340px|An access hatch to help make inspecting and maintaining rainwater cisterns easier to do for technicians or hired professionals. (Photo Source: TRCA).]]
<pdf width="900" height="800">File:LID-IM-Guide-2016-1.pdf RWH.pdf</pdf>


#Estimated life cycle costs represent NPV of associated costs in Canadian dollars per squaremetre of CDA ($/m2).
==References==
#Average annual maintenance cost estimates represent NPV of all costs incurred over the time period and do not include rehabilitation costs.
#Rehabilitation cost estimates represent NPV of all costs related to repair work assumed to occur every 25 years, including those associated with inspection and maintenance over a two (2) year establishment period for the plantings.
#Full Infiltration design life cycle costs are lower than Partial and No Infiltration designs due to the absence of a sub-drain to construct, inspect and routinely flush.
#Rehabilitation costs for Full Infiltration designs are estimated to be 26.4 to 28.4% of the original construction costs for High and Minimum Recommended Frequency maintenance program scenarios, respectively.
#Rehabilitation costs for Partial Infiltration designs are estimated to be 19.9 to 21.6% of the original construction costs for High and Minimum Recommended Frequency maintenance program scenarios, respectively.
#Rehabilitation costs for No Infiltration designs are estimated to be 20.2 to 21.9% of the original construction costs for High and Minimum Recommended Frequency maintenance program scenarios, respectively.
#Maintenance and rehabilitation costs over a 25 year time period for the Minimum Recommended maintenance scenario are estimated to be roughly equivalent to the original construction cost for Partial Infiltration and No Infiltration designs (96.2% and 97.8%, respectively), and 1.21 times the original construction cost for Full Infiltration design. 
#Maintenance and rehabilitation costs over a 25 year time period for the High Frequency maintenance scenario are estimated to be 1.32 times the original construction costs for Partial Infiltration, 1.34 times for No Infiltration designs, and 1.67 times for Full Infiltration designs.
#Maintenance and rehabilitation costs over a 50 year time period for the Minimum Recommended Frequency maintenance scenario are estimated to be approximately 1.76 times the original construction cost for Partial Infiltration designs, 1.79 times the original construction cost for No Infiltration designs, and 2.21 times the original construction cost for Full Infiltration designs.
#Maintenance and rehabilitation costs over a 50 year time period for the High Frequency maintenance scenario are estimated to be approximately 2.40 times the original construction cost for Partial Infiltration designs, 2.44 times the original construction cost for No Infiltration designs, and 3.04 times the original construction cost for Full Infiltration designs.