Changes

Jump to navigation Jump to search
Line 140: Line 140:
==Construction Inspection Tasks==
==Construction Inspection Tasks==


[[File:Grass Filter Strip.jpg MAPC.jpg|thumb|700 px|Example of a properly designed and implemented vegetated grass swale in a parking lot. It's important to check on the BMP after large storm events (>15 mm) to determine it's still in good condition and functioning as designed.]]
[[File:Grass Filter Strip.jpg MAPC.jpg|thumb|700 px|Example of a properly designed and implemented vegetated grass swale in a parking lot. It's important to check on the BMP after large storm events (>15 mm) to determine it's still in good condition and functioning as designed. (Photo Source: MAPC, 2010)<ref>METROPOLITAN AREA PLANNING COUNCIL (MAPC). 2010. Fact Sheet: Grass Filter Strips. Witten by: Kit Un. 5 February 2010. Accessed 12 July 2022. https://www.mapc.org/resource-library/fact-sheet-grass-filter-strips/</ref>]]


Construction inspections take place during several points in the construction sequence, specific to the type of LID BMP, but at a minimum should be done '''weekly''' and include the following:
Construction inspections take place during several points in the construction sequence, specific to the type of LID BMP, but at a minimum should be done '''weekly''' and include the following:

Navigation menu