Changes

Jump to navigation Jump to search
Line 103: Line 103:
*For permanent BMPs designed and installed to meet regulatory or municipal program requirements, inspections to verify compliance with ECA or maintenance agreement conditions and associated BMP specific inspection and maintenance plans (i.e., Maintenance Verification inspections) should occur on five (5) year intervals beginning after the date of assumption.  
*For permanent BMPs designed and installed to meet regulatory or municipal program requirements, inspections to verify compliance with ECA or maintenance agreement conditions and associated BMP specific inspection and maintenance plans (i.e., Maintenance Verification inspections) should occur on five (5) year intervals beginning after the date of assumption.  


Maintenance Verification inspections should also be performed when property ownership changes to ensure the new owner is not assuming a BMP that has been neglected by the previous owner, and to help educate the owner about their inspection and maintenance and record keeping responsibilities. Inspection and testing to verify that functional performance remains acceptable (i.e., Performance Verification inspections)should at a minimum, occur on fifteen (15) year intervals beginning after the date of assumption.
Maintenance Verification inspections should also be performed when property ownership changes to ensure the new owner is not assuming a BMP that has been neglected by the previous owner, and to help educate the owner about their inspection and maintenance and record keeping responsibilities.


====Performance Verification====
====Performance Verification====

Navigation menu