Created page with "Monitoring wells allow for measurement of water levels in the sub-surface components of LID practices. They are important for sampling procedures and ensuring that the LID feature are performing as intended.<br> Construction Steps:<br> #Install a cap stand at the required elevation to anchor the monitoring well. #Wrap the perforated pipe with a geotextile sock (to prevent migration of soil into the well). #Anchor the perforated pipe to the bottom of the LID feature. #In..."