Changes

Jump to navigation Jump to search
no edit summary
Line 12: Line 12:
Downloading.JPG|Inspection [[wells]] should be located at the edges or even off the side of permeable pavement areas
Downloading.JPG|Inspection [[wells]] should be located at the edges or even off the side of permeable pavement areas
IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON
IMAX water quality sampling (2).JPG|Water quality sampling in permeable pavement study, Mississauga ON
Gridpaver.png.jpg|Permeable grid system filled with gravel
perviousconcrete.png|Pervious concrete walkway plaza (Source: Villanova Urban Stormwater Partnership)
perviousconcrete.png|Pervious concrete walkway plaza (Source: Villanova Urban Stormwater Partnership)
PICPDouble.png|PICP on a road with concrete edge restraints separating the impervious and permeable pavements (source STEP)
PICPDouble.png|PICP on a road with concrete edge restraints separating the impervious and permeable pavements (source STEP)

Navigation menu