==Erosion and sediment control inspection and maintenance==
==Erosion and sediment control inspection and maintenance==


ESC measures require ongoing attention to ensure integrity and performance. ESC inspections should take place, at minimum, during installation, after rainfall events, and at the critical inspection points discussed in the [[Pre-construction: communication, inspection plan, and utilities coordination (section)]].
ESC measures require ongoing attention to ensure integrity and performance. ESC inspections should take place, at minimum, during installation, after rainfall events, and at the critical inspection points discussed in the [[Pre-construction#Communication, inspection plan, and utilities coordination|Pre-construction: Communication, inspection plan, and utilities coordination]]


At these inspections, keep an eye out for accumulated sediment, worn materials, compliance with the project's staging plan, and potential failure points.
At these inspections, keep an eye out for accumulated sediment, worn materials, compliance with the project's staging plan, and potential failure points.
Line 276: Line 276:
*Ensure perimeter fencing and access/staging areas are in alignment with design drawings.
*Ensure perimeter fencing and access/staging areas are in alignment with design drawings.
'''Mistakes to avoid'''
'''Mistakes to avoid'''
#Departing from the plan to stage and limit access points, material storage areas, and equipment storage areas
*Departing from the plan to stage and limit access points, material storage areas, and equipment storage areas
#Installing inadequate perimeter controls, e.g. inadequate sediment fencing or construction fencing
*Installing inadequate perimeter controls, e.g. inadequate sediment fencing or construction fencing