Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1:
===Thank you to all of our active community members below, for helping us to make corrections and find additional useful content===   
===Thank you to all of our active community members below, for helping us to make corrections and find additional useful content===   
'''18 April 2019'''
''Snout link is broken''
*Fixed on the [[pretreatment]] page.


'''12 April 2019'''
'''12 April 2019'''
Line 34: Line 39:

''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
*The [[notation]] used in the equations on [[Permeable paving: Sizing]] is being brought into line with the other sections of the site. Units have also been checked and brought into line to millimeters and hours as used for the other BMPs.
*The [[notation]] used in the equations on [[Permeable pavements: Sizing]] is being brought into line with the other sections of the site. Units have also been checked and brought into line to millimeters and hours as used for the other BMPs.


'''16 July 2018'''
'''16 July 2018'''

Navigation menu