===Thank you to all of our active community members below, for helping us to make corrections and find additional useful content===   
===Thank you to all of our active community members below, for helping us to make corrections and find additional useful content===   
'''18 April 2019'''
''Snout link is broken''
*Fixed on the [[pretreatment]] page.
'''12 April 2019'''
''It looks like there is a unit conversion error in the equation: ST=RVCT×Ac×C×0.1. When I do a unit conversion from mm.ha to m3, I find that the conversion factor should be 10, not 0.1.''
*You are quite right, thank you. This has now been corrected on the page [[Bioretention: Sizing]].
'''7 Feb 2019'''
''There is no "L" in the equation. Perhaps a second equation for a pipe orifice would help clarify that.''
*There were a few typos in the [[Flow_through_an_orifice|orifice equation]], it has been reviewed and we believe that they have all been corrected. That page also has a link to the adapted variation for [[Flow_through_perforated_pipe|perforated pipe flow.]]


'''20 November 2018'''
'''20 November 2018'''
Line 24: Line 39:

''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
''Do the units check out for calculating the total depth of the stone reservoir? (i.e. should f' be in units of m/hr instead of m/day?)''
*The [[notation]] used in the equations on [[Permeable paving: Sizing]] is being brought into line with the other sections of the site. Units have also been checked and brought into line to millimeters and hours as used for the other BMPs.
*The [[notation]] used in the equations on [[Permeable pavements: Sizing]] is being brought into line with the other sections of the site. Units have also been checked and brought into line to millimeters and hours as used for the other BMPs.


'''16 July 2018'''
'''16 July 2018'''

Navigation menu