Changes

Jump to navigation Jump to search
m
Line 37: Line 37:
===Site constraints===
===Site constraints===


When attempting to apply stormwater BMPs within a development site, give careful consideration to site conditions and constraints. Here is a [[LID Site Criteria and Constraints|handy table]] outlining the factors constraining the use of each LID BMP. Further information regarding constraints to the design of various end-of-pipe BMPs can be found in the Ontario Ministry of the Environment Stormwater Management Planning and Design Manual (2003). Before resorting to end-of-pipe BMPs, evaluate whether LID BMPs can meet the design criteria.
When attempting to apply stormwater BMPs within a development site, give careful consideration to site conditions and constraints. See this [[LID Site Criteria and Constraints|handy table]] for and outline of the factors constraining the use of each LID BMP. Further information regarding constraints to the design of various end-of-pipe BMPs can be found in the Ontario Ministry of the Environment Stormwater Management Planning and Design Manual (2003). Before resorting to end-of-pipe BMPs, evaluate whether LID BMPs can meet the design criteria.


===LID opportunities and land use types===
===LID opportunities and land use types===
722

edits

Navigation menu