Revision history of "Sub-grade"

Jump to navigation Jump to search

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • curprev 18:48, 3 August 2022Kyle menken talk contribs 735 bytes +735 Created page with "The term “sub-grade” refers to the excavated bottom of native soils that forms the bottom of a ground-level LID practice. Excavation to the subgrade will differ depending on whether the design is for an infiltrating or a non-infiltrating LID system. If it’s an infiltrating practice, the sub-grade should be as level as possible to promote even infiltration across the facility’s footprint. For non-infiltrating practices, excavate sub-grade slopes to the design gra..."