Changes

Jump to navigation Jump to search
no edit summary
Line 176: Line 176:
;first flush
;first flush
:Initial pulse of stormwater runoff which picks up the pollutants that have settled on surfaces during the dry period. The first flush contains the highest pollutant concentrations.
:Initial pulse of stormwater runoff which picks up the pollutants that have settled on surfaces during the dry period. The first flush contains the highest pollutant concentrations.
;FIT
;FIT work
;FIT Work
;FIT (Forensic Inspection and testing)
:FIT work involves the application of a similar set of inspection and testing indicators as those used in Performance Verification inspections, but focuses on diagnosing suspected problems with the following objectives in mind: (1) Confirm whether or not problems with BMP function exist; (2) Identify the causes of confirmed problems; (3) Determine corrective actions needed.


;Forebay
;Forebay
Line 650: Line 656:
;Porosity
;Porosity
;porosity
;porosity
:The porosity (n) of a mixture is the ratio of the volume of void-space to the total or bulk volume of the mixture. It is closely related to the concept of void ratio (e) where void ratio is the ratio of the volume of void-space to the volume of solids.
:The porosity (n) of a mixture is the ratio of the volume of void-space to the total or bulk volume of the mixture. It is closely related to the concept of void ratio (e) where void ratio is the ratio of the volume of void-space to the volume of solids. n = Volume of voids/Total volume of mixture = e/(1+e)  
 
n = Volume of voids/Total volume of mixture = e/(1+e)  


;Precipitation  
;Precipitation  
Line 684: Line 688:
;Runoff
;Runoff
;runoff  
;runoff  
:That potion of the water precipitated onto a catchment area, which flows as surface discharge from the catchment area past a specified point.  
:The portion of water precipitated onto a catchment area, which then flows as surface discharge from the catchment area past a specified point.


;Sand  
;Sand  

Navigation menu