Line 46: Line 46:
Of course, the real world is not black and white, and it is possible to blend these categories to meet a variety of different site stormwater management objectives.  The purpose of categorizing the treatment train types into design priorities is to highlight the need to consider different objectives, while recognizing that if the design priority of the treatment train is narrowly focused, objectives other than those targeted may not be met.   
Of course, the real world is not black and white, and it is possible to blend these categories to meet a variety of different site stormwater management objectives.  The purpose of categorizing the treatment train types into design priorities is to highlight the need to consider different objectives, while recognizing that if the design priority of the treatment train is narrowly focused, objectives other than those targeted may not be met.   


==Calculating Water Quality Performance of Treatment Trains==
==Calculating [[Water Quality]] Performance of Treatment Trains==
The performance of a treatment train will vary based on the type of stormwater treatment practices implemented and their arrangement within the treatment train.  Various changes occur as runoff moves through the treatment train.  Key changes that need to be considered when calculating treatment train performance include:
The performance of a treatment train will vary based on the type of stormwater treatment practices implemented and their arrangement within the treatment train.  Various changes occur as [[Runoff volume control targets|runoff]] moves through the treatment train.  Key changes that need to be considered when [[Low impact development treatment train tool|calculating treatment train performance]] including:


===1. Changes in the composition of runoff, especially the size distribution of sediment particles.===
===1. Changes in the composition of runoff, especially the [[Grain size analysis|size distribution of sediment particles]]===
Stormwater facilities are often designated as providing enhanced (80% TSS removal) or basic treatment (50 to 60% TSS removal) based on their capacity to remove fine particles (MOE, 2003)<ref>Ministry of Environment. 2003. Stormwater Management Planning and Design Manual. March 2003. Copyright: Queen’s Printer for Ontario, 2003. ISBN 0-7794-2969-9. PIBS 4329e. Accessed: https://www.ontario.ca/document/stormwater-management-planning-and-design-manual-0.</ref>. These facilities change not only sediment loads of sediment but also the composition of sediment loads, which has important implications for calculating performance.
Stormwater facilities are often designated as providing enhanced (80% TSS removal) or basic treatment (50 to 60% TSS removal) based on their capacity to remove fine particles (MOE, 2003)<ref>Ministry of Environment. 2003. Stormwater Management Planning and Design Manual. March 2003. Copyright: Queen’s Printer for Ontario, 2003. ISBN 0-7794-2969-9. PIBS 4329e. Accessed: https://www.ontario.ca/document/stormwater-management-planning-and-design-manual-0.</ref>. These facilities change not only sediment loads of sediment but also the composition of sediment loads, which has important implications for calculating performance.
===2. Changes in influent concentration===
Removal efficiency calculations are sensitive to influent concentration because facility effluent concentrations cannot be reliably reduced beyond a certain level, which varies by facility type.  For example, a pond may have an ‘irreducible’ effluent concentration of 30 mg/L for an average rainfall year.  If the TSS influent concentration to the pond is 200 mg/L, the pond removal efficiency would be 85%.  If the treatment practice(s) upstream of the pond reduce the pond influent concentration to only 100 mg/L, the TSS removal efficiency of pond would only be 70%. This value may be even lower if the 100 mg/L contains a higher percentage of fine particles than untreated runoff (which is often the case).
===3. Changes in [[Runoff volume control targets|runoff volume]]===
Where runoff is being reduced along the treatment train through infiltration and evapotranspiration, there will be a change in [[water quality]] loading that needs to be considered.
The water quality load is the product of runoff concentrations and runoff volumes.  Hence, a change in either of these variables will result in a change in load.  As concentrations and volumes are affected by different variables it is best to consider the components separately, and then combine them to calculate overall load based performance for the treatment train under consideration.   
===Calculations for Load Based Performance==
Treatment performance of facilities designed to reduce runoff volumes would be calculated based on their capacity to reduce water quality loads, as seen below:


==References==
==References==