Page history
Jump to navigation
Jump to search
22 September 2022
29 July 2022
21 July 2022
no edit summary
−24
no edit summary
−8
no edit summary
−4
Created page with "''INSERT YOUTUBE LINK: https://www.youtube.com/watch?v=Ng_s2ErvPqk&t=58s <br>'' The storage reservoir layer holds and directs the stormwater into the underlying/native soils. The LID facilities, if applicable, should be filled with uniformly graded, washed stone (20 mm – 50 mm) that provides 30 to 40% void space. ‘’’Construction steps:’’’ #Backfill material from outside of the LID facility to avoid compaction and sediment entering the facilities. Use a s..."
+1,411