Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Construction: storage reservoir
(view source)
Revision as of 16:03, 21 July 2022
24 bytes removed
,
2 years ago
no edit summary
Line 6:
Line 6:
#Place the material to the elevation and thickness as per the design specifications.
#Place the material to the elevation and thickness as per the design specifications.
‘’’Key
Inspection Points:
’’’
'''Key
Inspection Points:
'''
*Material arrival to the site:
*Material arrival to the site:
**Check chain of custody
**Check chain of custody
Line 14:
Line 14:
*Installed aggregate is at the correct elevation as per design.
*Installed aggregate is at the correct elevation as per design.
‘’’Mistakes
to Avoid:
’’’
'''Mistakes
to Avoid:
'''
*Accepting material that does not meet design requirements and specifications.
*Accepting material that does not meet design requirements and specifications.
*Installing material with heavy equipment from the inside of the LID facility
*Installing material with heavy equipment from the inside of the LID facility
SamanthaPelayo
502
edits
Navigation menu
Personal tools
English
Log in
Namespaces
Page
Discussion
Variants
expanded
collapsed
Views
Read
View source
View history
More
expanded
collapsed
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version