Page history
Jump to navigation
Jump to search
27 September 2022
22 September 2022
no edit summary
−21
no edit summary
+15
no edit summary
+15
Created page with "Because permeable pavements may be required to support heavy loads (driveways, laneways, etc.), the sub-base and base course may require compaction to prevent heaving and shifting. ===Sub-base reservoir=== In permeable pavement systems, the sub-base is the layer of granular material that is laid on the sub-grade. The granular sub-base should be clear, crushed 50 mm stone. See the Permeable pavements: Specifications page for detailed sub-base material specifications. Th..."
+2,792