User contributions for SamanthaPelayo
Jump to navigation
Jump to search
- 18:39, 30 September 2022 diff hist 0 Finishing grades and surface layer installation: permeable pavements current
- 18:39, 30 September 2022 diff hist +2 Finishing grades and surface layer installation: permeable pavements
- 18:38, 30 September 2022 diff hist 0 Finishing grades and surface layer installation: permeable pavements
- 18:38, 30 September 2022 diff hist +148 Finishing grades and surface layer installation: permeable pavements
- 18:28, 30 September 2022 diff hist 0 N File:P1000154.JPG current
- 18:21, 30 September 2022 diff hist −2 Finishing grades and surface layer installation: permeable pavements
- 18:20, 30 September 2022 diff hist +216 Finishing grades and surface layer installation: permeable pavements
- 15:35, 30 September 2022 diff hist +52 Construction: plant material verification and installation current
- 22:24, 22 September 2022 diff hist −898 Finishing grades and surface layer installation: vegetated LIDs →Large stone and riprap
- 22:24, 22 September 2022 diff hist +30 Finishing grades and surface layer installation: vegetated LIDs →Large stone and riprap
- 22:24, 22 September 2022 diff hist 0 Riprap: Gallery current
- 22:23, 22 September 2022 diff hist +78 Riprap: Gallery
- 22:21, 22 September 2022 diff hist +17 Finishing grades and surface layer installation: vegetated LIDs →Finish grading
- 22:20, 22 September 2022 diff hist +15 Finishing grades and surface layer installation: vegetated LIDs →Finish grading
- 22:20, 22 September 2022 diff hist −1 Finishing grades and surface layer installation: vegetated LIDs →Soil media and amendments
- 22:19, 22 September 2022 diff hist −2 Finishing grades and surface layer installation: vegetated LIDs →Soil media and amendments
- 22:19, 22 September 2022 diff hist +276 Finishing grades and surface layer installation: vegetated LIDs →Soil media and amendments
- 22:16, 22 September 2022 diff hist +30 Finishing grades and surface layer installation: vegetated LIDs
- 22:16, 22 September 2022 diff hist −16 Finishing grades and surface layer installation: vegetated LIDs →As-built surveys
- 22:15, 22 September 2022 diff hist −3,885 Sub-surface components →Pretreatment and inlet current
- 22:15, 22 September 2022 diff hist +42 Sub-surface components →Pretreatment and inlet
- 22:14, 22 September 2022 diff hist +3 Construction: pretreatment and inlet current
- 22:13, 22 September 2022 diff hist +33 Construction: pretreatment and inlet
- 22:12, 22 September 2022 diff hist +1 Construction: curbing current
- 22:12, 22 September 2022 diff hist +4 Construction: curbing
- 22:11, 22 September 2022 diff hist −1,903 Sub-surface components →Curbing
- 22:11, 22 September 2022 diff hist +27 Sub-surface components →Curbing
- 22:10, 22 September 2022 diff hist +367 Sub-surface components →Stone choker layer
- 22:08, 22 September 2022 diff hist −14 Trench, chamber, and perforated pipe: Installation
- 22:07, 22 September 2022 diff hist −6,087 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 22:06, 22 September 2022 diff hist +57 Sub-surface components →Trench, Chamber, and Perforated Pipe Installation
- 22:05, 22 September 2022 diff hist +5 Trench, chamber, and perforated pipe: Installation
- 22:05, 22 September 2022 diff hist +6 Trench, chamber, and perforated pipe: Installation
- 22:05, 22 September 2022 diff hist +175 Trench, chamber, and perforated pipe: Installation
- 22:02, 22 September 2022 diff hist +6,071 N Trench, chamber, and perforated pipe: Installation Created page with "The guidance provided in this section is applicable for the construction of soakaway pits, infiltration chambers, infiltration trenches, and exfiltration pipes of varying size and shape, since the installation of each of these features is similar. File:Chamber-excavator.jpg|400px|thumb|right|An excavator covering units of unfinished infiltration chamber rows with perimeter stone. Stone can be applied progressively as the rows are completed to ensure that space is prov..."
- 22:01, 22 September 2022 diff hist +6 Bedding layer current
- 22:00, 22 September 2022 diff hist −21 Permeable pavement sub-base and base course
- 22:00, 22 September 2022 diff hist −2,795 Sub-surface components →Permeable pavement sub-base and base course
- 22:00, 22 September 2022 diff hist +50 Sub-surface components →Permeable pavement sub-base and base course
- 21:59, 22 September 2022 diff hist +15 Permeable pavement sub-base and base course
- 21:59, 22 September 2022 diff hist +15 Permeable pavement sub-base and base course
- 21:59, 22 September 2022 diff hist +2,792 N Permeable pavement sub-base and base course Created page with "Because permeable pavements may be required to support heavy loads (driveways, laneways, etc.), the sub-base and base course may require compaction to prevent heaving and shifting. ===Sub-base reservoir=== In permeable pavement systems, the sub-base is the layer of granular material that is laid on the sub-grade. The granular sub-base should be clear, crushed 50 mm stone. See the Permeable pavements: Specifications page for detailed sub-base material specifications. Th..."
- 21:58, 22 September 2022 diff hist +1 Sub-surface components →Base course
- 21:58, 22 September 2022 diff hist +1 Sub-surface components →Sub-base reservoir
- 21:58, 22 September 2022 diff hist +50 Sub-surface components →Permeable pavement sub-base and base course
- 21:57, 22 September 2022 diff hist +287 Sub-surface components →Permeable pavement sub-base and base course
- 21:55, 22 September 2022 diff hist +14 Sub-surface components →References
- 21:55, 22 September 2022 diff hist +16 Sub-surface components
- 21:54, 22 September 2022 diff hist 0 Sub-surface components →Permeable pavement sub-base and base course
- 21:54, 22 September 2022 diff hist −2 Sub-surface components →Sub-base reservoir