Then adjust A<sub>p</sub> accordingly to keep R, the ratio of impervious contributing drainage area to water storage reservoir (i.e., permeable pavement) area, between 0 and 2 to reduce hydraulic loading and avoid premature clogging.
Then increase A<sub>r</sub> accordingly to keep R, the ratio of impervious contributing drainage area to water storage reservoir (i.e., permeable pavement) area, between 0 and 2 to reduce hydraulic loading and avoid premature clogging, assuming A<sub>r</sub> = A<sub>p/sub>.