Changes

Jump to navigation Jump to search
no edit summary
Line 37: Line 37:
<br>
<br>
<br>
<br>
Then increase A<sub>r</sub> accordingly to keep R, the ratio of impervious contributing drainage area to water storage reservoir (i.e., permeable pavement) area, between 0 and 2 to reduce hydraulic loading and avoid premature clogging, assuming A<sub>r</sub> = A<sub>p/sub>.   
Then increase A<sub>r</sub> accordingly to keep R, the ratio of impervious contributing drainage area to water storage reservoir (i.e., permeable pavement) area, between 0 and 2 to reduce hydraulic loading and avoid premature clogging, assuming A<sub>r</sub> = A<sub>p</sub>.   




Back to [[Permeable pavements]]
Back to [[Permeable pavements]]
[[Category:Calculations]]
[[Category:Calculations]]

Navigation menu