Difference between revisions of "LID Construction"
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
==Phases of LID Construction== | ==Phases of LID Construction== | ||
'''1. Pre-Construction:''' | |||
*Verification of design | |||
*Tendering and contract | |||
*Pre-construction inspection and protocols | |||
*Mobilizing, access and perimeter controls | |||
*Erosion and Sediment Control (ESC) | |||
'''2. Construction:''' | |||
*Excavation and mass grading | |||
*Backfill granular and pipes | |||
*Finish grades: inlet, outlet, biomedia and plants | |||
'''3. Post-Construction:''' | |||
*Address deficiencies | |||
*Assumption protocols | |||
==Why is inspection important for LID Construction?== | ==Why is inspection important for LID Construction?== |
Revision as of 17:00, 11 February 2022
Why is construction different?[edit]
Why problems occur?[edit]
Phases of LID Construction[edit]
1. Pre-Construction:
- Verification of design
- Tendering and contract
- Pre-construction inspection and protocols
- Mobilizing, access and perimeter controls
- Erosion and Sediment Control (ESC)
2. Construction:
- Excavation and mass grading
- Backfill granular and pipes
- Finish grades: inlet, outlet, biomedia and plants
3. Post-Construction:
- Address deficiencies
- Assumption protocols