Difference between revisions of "LID Construction"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
Line 25: Line 25:
==Construction Guidance==
==Construction Guidance==


{{Clickable button|[[Bioretention: Construction]]}}
{{Clickable button|[[Bioretention: Construction]]}} {{Clickable button|[[Swales: Construction]]}} <br> <br>
 
{{Clickable button|[[Permeable Pavements: Construction]]}} <br> <br>
{{Clickable button|[[Blue Roofs: Construction]]}} {{Clickable button|[[Green Roofs: Construction]]}} <br> <br>
 
{{Clickable button|[[Stormwater Planters: Construction]]}}

Revision as of 19:32, 11 February 2022

Why is construction different?[edit]

Why problems occur?[edit]

Phases of LID Construction[edit]

1. Pre-Construction:

  • Verification of design
  • Tendering and contract
  • Pre-construction inspection and protocols
  • Mobilizing, access and perimeter controls
  • Erosion and Sediment Control (ESC)

2. Construction:

  • Excavation and mass grading
  • Backfill granular and pipes
  • Finish grades: inlet, outlet, biomedia and plants

3. Post-Construction:

  • Address deficiencies
  • Assumption protocols

Why is inspection important for LID Construction?[edit]

Construction Guidance[edit]

Bioretention: Construction Swales: Construction

Permeable Pavements: Construction

Blue Roofs: Construction Green Roofs: Construction 

Stormwater Planters: Construction