Changes

Jump to navigation Jump to search
Line 141: Line 141:

[[File:Borehole drilling.jpg|thumb|500px|Borehole drilling for the City of Brampton thermal mitigation pilot project. (Photo: [[Acknowledgements|TRCA, 2020]])]]<br>
[[File:Borehole drilling.jpg|thumb|500px|Borehole drilling for the City of Brampton thermal mitigation pilot project. (Photo: [[Acknowledgements|TRCA, 2020]])]]<br>
</br>


'''Design Considerations'''
'''Design Considerations'''
Line 152: Line 151:

'''Expected Performance'''
'''Expected Performance'''
Geothermal Cooling works best with subsurface draw outlets (1.2 m or deeper) that provide cooling of the higher flows and would be less expensive than installing additional boreholes (at least in new builds).  When sized appropriately, geothermal systems can shave a few degrees off of the average pond outflow temperature.
Geothermal Cooling works best with subsurface draw outlets (1.2 m or deeper) that provide cooling of the higher flows and would be less expensive than installing additional boreholes (at least in new builds).  When sized appropriately, geothermal systems can shave a few degrees off of the average pond outflow temperature.<br>
</br>


===Other Options===
===Other Options===

Navigation menu