(Created page with "This section is also applicable to: {{Clickable button|Soakaways}} {{Clickable button|Infiltration chambers}} ==Construction Tasks Table== ==Construction Tasks Described== ==Key Construction Inspection Points== ==Inspection Point Timeline== ==Construction Mistakes to Avoid== <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-Book-92.pdf</pdf> <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-Book-93.pdf</pdf> <pdf width="500" heig...")
 
 
Line 4: Line 4:


==Construction Tasks Described==
==Construction Tasks Described==
'''Verification of Siting and LID Design'''<br>
'''Installation of ESC and Construction Fencing'''<br>
'''ESC Inspection and Maintenance (ongoing)'''<br>
'''Clearing and Grubbing'''<br>
'''Excavation'''<br>
'''Rough Grade'''<br>
'''Verification of Grading/Survey*'''<br>
'''Scarification'''<br>               
'''Geotextile'''<br>                                                           
'''Impermeable liner'''<br>                               
'''Underdrain'''<br>
'''Overflow or Overflow Drain'''<br>                                     
'''Monitoring well'''<br>                               
'''Storage Reservoir'''<br>
'''Stone Choker  Layer'''<br>                     
'''Curbing'''<br>                                                 
'''Pre-treatment and Inlet'''<br>                 
'''Soil Media / Filter Media'''<br>
'''Finish Grading'''<br>
'''Riprap (Large Stone)'''<br>                       
'''Plant Material Verification and Installation'''<br>
'''Mulch Placement'''<br>                                                               
'''Stabilizing Contributing Drainage Area  - Planting Adjacent Vegetation'''<br>
'''As-built Survey'''<br>
'''Permanent Fencing'''<br>                                         
'''Identify and Address Deficiencies'''<br>
'''Assumption/Certification'''<br>


==Key Construction Inspection Points==
==Key Construction Inspection Points==

Latest revision as of 19:27, 19 April 2022

This section is also applicable to: Soakaways Infiltration chambers

Construction Tasks Table[edit]

Construction Tasks Described[edit]

Verification of Siting and LID Design
Installation of ESC and Construction Fencing
ESC Inspection and Maintenance (ongoing)
Clearing and Grubbing
Excavation
Rough Grade
Verification of Grading/Survey*
Scarification
Geotextile
Impermeable liner
Underdrain
Overflow or Overflow Drain
Monitoring well
Storage Reservoir
Stone Choker Layer
Curbing
Pre-treatment and Inlet
Soil Media / Filter Media
Finish Grading
Riprap (Large Stone)
Plant Material Verification and Installation
Mulch Placement
Stabilizing Contributing Drainage Area - Planting Adjacent Vegetation
As-built Survey
Permanent Fencing
Identify and Address Deficiencies
Assumption/Certification

Key Construction Inspection Points[edit]

Inspection Point Timeline[edit]

Construction Mistakes to Avoid[edit]

You do not have permission to embed PDF files. You do not have permission to embed PDF files. You do not have permission to embed PDF files. You do not have permission to embed PDF files.


Click below to review the following common construction-based mistakes to avoid:


You do not have permission to embed PDF files.

Construction Certifications Protocols[edit]