Changes

Jump to navigation Jump to search
no edit summary
Line 23: Line 23:
*Use of wrong curb form.  
*Use of wrong curb form.  
*Concrete wash out within or upstream of LID facility.
*Concrete wash out within or upstream of LID facility.
*Ensure curb granular base (granular A) does spill over into LID infiltration area. If material spills over, remove as best as possible while still maintaining the 2:1 slope for curbing
*Ensure curb granular base (granular A) does not spill over into LID infiltration area. If material spills over, remove as best as possible while still maintaining the 2:1 slope for curbing
*Lack of communication to concrete contractor or ready-mix driver explaining the function and importance of protecting the LID feature.
*Lack of communication to concrete contractor or ready-mix driver explaining the function and importance of protecting the LID feature.


For more information on curb cuts, see these pages: [[Curb cuts]], [[Curb cuts: Gallery]] and [[Bioretention: Streetscapes]]<br>
For more information on curb cuts, see these pages: [[Curb cuts]], [[Curb cuts: Gallery]] and [[Bioretention: Streetscapes]]<br>

Navigation menu