"'INSERT VIDEO FROM HAGGERT AVE: \\Hqcvcfs01\cvc2\Watershed Management\Integrated Water Management Implementation\Fletchers Creek SNAP\Haggert Ave Road Retrofit\3 - Photos\Construction Photos\Site Visit_20201120\Riverstone Construction   Haggert Ave Inlet_F.mp4''
"'INSERT VIDEO FROM HAGGERT AVE: \\Hqcvcfs01\cvc2\Watershed Management\Integrated Water Management Implementation\Fletchers Creek SNAP\Haggert Ave Road Retrofit\3 - Photos\Construction Photos\Site Visit_20201120\Riverstone Construction   Haggert Ave Inlet_F.mp4''
[[File:20150618 114542.jpg|thumb|500px|right|Improper elevation at the curb cut, impeding the inflow to enter the LID facility (bioretention) (Photo source: CVC)]]


It is very important to make sure that the contractor responsible for curb construction understands curb cut designs and elevations. This is often a new technique for contractors, and they may not understand the overall concept of water in the gutter line being directed behind the gutter.<br>  
It is very important to make sure that the contractor responsible for curb construction understands curb cut designs and elevations. This is often a new technique for contractors, and they may not understand the overall concept of water in the gutter line being directed behind the gutter.<br>  
Line 10: Line 11:
#Provide sufficient curing time, according to CSA standard A23.1-09.
#Provide sufficient curing time, according to CSA standard A23.1-09.


[[File:20150618 114542.jpg|thumb|500px|right|Caption]]
[[File:P1160129.JPG|thumb|400px|right|Ensure curb granular base (granular A) does not spill over into LID infiltration area. If material spills over, remove as best as possible while still maintaining the 2:1 slope for curbing. (Photo source: CVC)]]
[[File:P1160129.JPG|thumb|400px|right|Caption]]
'''Key Inspection Points:'''     
'''Key Inspection Points:'''     
*Use of proper curb form by sub-contractor.
*Use of proper curb form by sub-contractor.