Difference between revisions of "Construction: storage reservoir"

From LID SWM Planning and Design Guide
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 6: Line 6:
#Place the material to the elevation and thickness as per the design specifications.
#Place the material to the elevation and thickness as per the design specifications.


‘’’Key Inspection Points:’’’
'''Key Inspection Points:'''
*Material arrival to the site:  
*Material arrival to the site:  
**Check chain of custody
**Check chain of custody
Line 14: Line 14:
*Installed aggregate is at the correct elevation as per design.
*Installed aggregate is at the correct elevation as per design.


‘’’Mistakes to Avoid:’’’
'''Mistakes to Avoid:'''
*Accepting material that does not meet design requirements and specifications.
*Accepting material that does not meet design requirements and specifications.
*Installing material with heavy equipment from the inside of the LID facility
*Installing material with heavy equipment from the inside of the LID facility
Line 20: Line 20:
*Leaving heavy equipment (excavator) for long periods of time within the LID facility.  
*Leaving heavy equipment (excavator) for long periods of time within the LID facility.  


For more information on the storage reservoir, see the page: [[Reservoir aggregate]].
For more guidance on materials specifications, refer to [[Aggregates]], [[OPSS aggregates]] and ([https://www.roadauthority.com/Standards/?id=a28fdfaf-3bf8-4679-81ca-4e44b2263cf8 Ontario Provincial Standards, 2013]) <ref>Ontario Provincial Standards. 2013. OPSS.PROV.10101 Aggregates - Base, Subbase Select Subgrade, and Backfill Material. https://www.roadauthority.com/Standards/?id=a28fdfaf-3bf8-4679-81ca-4e44b2263cf8</ref>

Latest revision as of 21:49, 22 September 2022

INSERT YOUTUBE LINK: https://www.youtube.com/watch?v=Ng_s2ErvPqk&t=58s
The storage reservoir layer holds and directs the stormwater into the underlying/native soils. The LID facilities, if applicable, should be filled with uniformly graded, washed stone (20 mm – 50 mm) that provides 30 to 40% void space.

Construction steps:

  1. Backfill material from outside of the LID facility to avoid compaction and sediment entering the facilities. Use a slinger truck if possible.
  2. Place the material to the elevation and thickness as per the design specifications.

Key Inspection Points:

  • Material arrival to the site:
    • Check chain of custody
    • Verify it meets specifications as per design
    • Verify no debris or fines within the aggregate (it’s a washed stone)
  • Granular material should be 19 - 50 mm clear stone or as per design. See Aggregates for further details.
  • Installed aggregate is at the correct elevation as per design.

Mistakes to Avoid:

  • Accepting material that does not meet design requirements and specifications.
  • Installing material with heavy equipment from the inside of the LID facility
  • Installing frozen aggregate. Do not install frozen aggregate
  • Leaving heavy equipment (excavator) for long periods of time within the LID facility.

For more guidance on materials specifications, refer to Aggregates, OPSS aggregates and (Ontario Provincial Standards, 2013) [1]

  1. Ontario Provincial Standards. 2013. OPSS.PROV.10101 Aggregates - Base, Subbase Select Subgrade, and Backfill Material. https://www.roadauthority.com/Standards/?id=a28fdfaf-3bf8-4679-81ca-4e44b2263cf8