'''Construction Steps:'''
'''Construction Steps:'''
*Installation of pre-treatment features will vary based upon type. Similarly, installation timeline will range with type and could occur at excavation and mass grading, curb work or at finishing grade. Given pre-treatment features are typically integrated with the LID inlet coordination amongst multiple sub-contractors is sometime needed. The following details steps for various pre-treatment types:
*Installation of [[pretreatment]] features will vary based upon type. Similarly, installation timeline will range with type and could occur at excavation and mass grading, curb work or at finishing grade. Given pre-treatment features are typically integrated with the LID inlet coordination amongst multiple sub-contractors is sometime needed. The following details steps for various pre-treatment types:
*Vegetation: Follow the guidance shown below in the section “Plant Material Verification and Installation”
*[[Vegetation]]: Follow the guidance shown below in the section “Plant Material Verification and Installation”
*Curbing: Follow the guidance shown above in the section “Curbing”.
*[[curb cuts|Curbing]]: Follow the guidance shown above in the section “Curbing”.
*Aggregate: Follow the guidance shown above in the section “Stone reservoir”.
*[[Aggregates|Aggregate]]: Follow the guidance shown above in the section “Stone reservoir”.
<gallery mode="packed" widths=300px heights=300px>
<gallery mode="packed" widths=300px heights=300px>
IMG_0891.JPG|Aggregate material (rock) installed as the inlet and pre-treatment device in the rain garden at Glendale P.S. in Brampton, ON. The runoff comes from a vegetated swale into the inlet, conveying it into the rain garden. (Photo Source: CVC, 2021)
IMG_0891.JPG|Aggregate material (rock) installed as the inlet and pre-treatment device in the rain garden at Glendale P.S. in Brampton, ON. The runoff comes from a vegetated swale into the inlet, conveying it into the rain garden. (Photo Source: CVC, 2021)
Line 20: Line 20:

<gallery mode="packed" widths=275px heights=275px>
<gallery mode="packed" widths=275px heights=275px>
P1160102.JPG|Installation of Jellyfish filter and sorbtive media vault at the IMAX bioswale project in Mississauga, ON.
P1160102.JPG|Installation of Jellyfish filter and sorbtive media vault at the IMAX bioswale project in Mississauga, ON. (Photo Source: CVC, 2012)
P1160117.JPG|Installation of Jellyfish filter and sorbtive media vault at the IMAX bioswale project in Mississauga, ON.
P1160117.JPG|Installation of Jellyfish filter and sorbtive media vault at the IMAX bioswale project in Mississauga, ON. (Photo Source: CVC, 2012)
P1160121.JPG|Installation of Jellyfish filter and sorbtive media vault at the IMAX bioswale project in Mississauga, ON.
P1160121.JPG|Installation of Jellyfish filter and sorbtive media vault at the IMAX bioswale project in Mississauga, ON. (Photo Source: CVC, 2012)


</gallery>
</gallery>
Line 29: Line 29:

'''Key Inspection Points:'''
'''Key Inspection Points:'''
*Verify that the correct pre-treatment device (jellyfish filter, vegetation, curbing, etc.) is being installed.
*Verify that the correct pre-treatment device ([[pretreatment|jellyfish filter]], [[vegetation]], [[curb cuts|curbing]], etc.) is being installed.
*Verify that all components of the pre-treatment device are installed
*Verify that all components of the pre-treatment device are installed
*Verify correct size and location of pre-treatment device.
*Verify correct size and location of pre-treatment device.
Line 49: Line 49:
*Using wrong concrete forms if concrete curbs are part of pre-treatment.
*Using wrong concrete forms if concrete curbs are part of pre-treatment.